Layout and workflow
Commercial kitchen design that works on the busiest night
Kitchen layouts, equipment schedules and utility drawings for restaurants, hotels, central kitchens and cafés across the UAE, drawn by the team in Mussafah that will supply, fabricate and install the kitchen.
Most of the problems a kitchen has in its first month of trading were drawn in. A dish area too small for the plates coming back, a cold room door that opens into the cooking line, a fryer with no space for the oil filter beside it. Commercial kitchen design is the stage where these are easy to fix, because they are lines on a drawing rather than equipment bolted to a wall.
Al Rumooz designs kitchens as part of supplying and installing them, from our base in Mussafah, Abu Dhabi. Because the people drawing the layout also choose the equipment, fabricate the stainless and send the installation crew, the drawing has to be buildable. We work for owners, operators, interior designers and MEP consultants on restaurant kitchen design, hotel kitchens, central production kitchens and compact cafés.
Zoning and flow: the order food moves in
Every kitchen layout starts with the same sequence, whatever the cuisine. Food arrives, is stored, prepared, cooked, served, and the dishes come back to be washed. The design job is to lay those zones out so each step leads to the next without doubling back, and so that dirty and clean, raw and cooked do not cross.
Receiving: a door and a space to check, weigh and break down deliveries, close to the stores and away from the pass.
Storage: dry store, chiller and freezer, positioned so stock goes straight in from receiving and out towards prep.
Preparation: separate areas, or at least separate benches, sinks and chopping boards, for raw meat, fish, vegetables and ready-to-eat food.
Cooking: the hot line under the hood, grouped by station so a chef does not walk the length of the kitchen for one dish.
Service: the pass, where cooked food is plated and handed to service staff, kept clear of returning dirty plates.
Washing: dish and pot wash, placed where service staff can drop plates without entering the cooking area, with clean storage on the far side.
Separating raw from cooked
Food safety rules in the UAE expect the layout to prevent cross-contamination, and in Abu Dhabi food establishments are regulated by ADAFSA. In practice this means raw and ready-to-eat food have their own prep areas and refrigeration, hand-wash sinks are placed where staff change task, and waste leaves without passing through clean areas. Requirements vary by emirate and by type of business, so confirm the current rules with the authority before the layout is finalised.
Sizing the kitchen to the menu, not the room
A kitchen is sized by what it has to produce at its busiest hour. We ask for the menu, the expected covers or orders at peak, the service style (à la carte, buffet, delivery, banqueting) and the days and hours of trading. From that we work out which stations are needed, how much refrigeration each station needs close at hand, and what the dish area must handle. The room then either fits that brief, or the menu and layout are adjusted together.
Design stages, from brief to installation drawings
Joining early leaves the most options open, but we can also step in to review a design that is already drawn.
Brief
Menu, covers, service style, opening hours, priorities for each area and any operator standards you already follow.
Site survey
Dimensions, ceiling height, columns, existing gas, power, water and drainage, and possible routes for the exhaust duct.
Concept layout
A first plan showing zones and flow. This is the stage to argue about, because moves are still free.
Equipment selection
Each station is filled with specific equipment, gas or electric, with sizes checked against the menu and the space.
Detailed drawings
Layout, equipment schedule, MEP points and elevations, coordinated with the architect, interior designer and MEP engineer.
Approval support
Drawings and equipment data your consultant or fit-out contractor needs for authority submissions, revised if comments come back.
Fabrication and installation
Stainless items are made in our Mussafah workshop from measured site dimensions, and the equipment is installed and commissioned against the same drawings.
What the design deliverables are
- Layout plan
- The scaled floor plan with every piece of equipment, bench and sink placed and numbered.
- Equipment schedule
- The list that matches each number on the plan to a make, model, size, quantity, fuel type and connection details.
- MEP points drawing
- Where each gas, power, water, drain and data point has to be, at what height and with what load, for the MEP engineer to design around.
- Elevations
- Wall views showing heights of benches, shelves, hoods, splashbacks and sockets, so trades fit together vertically as well as on plan.
- Hood and extraction details
- Hood sizes and positions over the cooking line, with duct connection points and make-up air requirements for the MEP engineer.
- Drainage plan
- Floor drains, gratings and grease trap position, placed so they do not clash with equipment legs, door tracks or cold room floors.
- Fabrication drawings
- Shop drawings for each custom stainless item, issued for approval before cutting.
Design mistakes we see most often
Mistake
Starting from the room and filling it with equipment.
Do this instead
Start from the menu and peak volume, then check whether the room supports it.
Mistake
A dish area sized last, with what space is left.
Do this instead
Size warewashing early. It is often the bottleneck on a busy night.
Mistake
Cold storage far from the stations that use it.
Do this instead
Put undercounter refrigeration at each station and walk-in storage between receiving and prep.
Mistake
Fryers and char broilers placed with no thought for the hood.
Do this instead
Group the heaviest grease and heat producers so the hood can be sized and placed for them.
Mistake
Floor drains under equipment legs or door tracks.
Do this instead
Draw drainage with the equipment, not as a separate MEP exercise.
Mistake
No hand-wash sinks at the points where staff switch tasks.
Do this instead
Place them at the entrance to prep, at the hot line and near the pass.
Mistake
No space allowed for maintenance access.
Do this instead
Leave room to pull equipment out and reach condensing units, fans and panels.
Common questions
Starting a kitchen layout?
Send us your menu, expected covers and the floor plan or photos of the space. We will reply with the next step, usually a site survey and a concept layout.
Request a quote
Name and phone are enough to start. Our team calls you back to scope the job.

